Proceeding 27729  Register

Applications 27729-A001

Commencement of oral argument: May 14, 2024, at 10 a.m.

Decision expected: Fall 2024

Watch an AUC hearing

Overview

The Alberta Utilities Commission (AUC), the independent utilities regulator, will be holding a virtual oral argument to review the application and submissions received to consider the power plant amendment application in Proceeding 27729.

WR2 Wind GP Corp. (WR2) has applied to amend the approved Wild Rose 2 Wind Power Plant. The project would be located approximately 30 kilometres southeast of Medicine Hat, as shown in the map below.

Further information about the proceeding is available through the AUC’s eFiling System under Proceeding 27729.

Oral argument information

The AUC will be holding an oral argument consider the wind power plant amendment application in Proceeding 279729. The oral argument will commence on May 14, 2024, at 10 a.m. 

To learn more about the review process, or for more information about how you may become involved in this proceeding, please contact us or visit the following webpages:

The eFiling System​

The eFiling System should be accessed to view the applications and the other documents the AUC will be considering in this proceeding. The system is also used to file submissions and evidence to participate in the proceeding.

To create an account, select “New account” and follow the steps to create a user ID and password. If you have any questions about how to use the system please contact us at info@auc.ab.ca or 310-4AUC.

Documents being considered in this proceeding can be found in the eFiling​ System (which requires log in). Once you have logged in, enter 27729 in the “go to” section at the top left corner of your screen.​

Wild Rose 2 Wind Power Plant amendment